Home › Guides › Estimate follow-up

Sales · How-to

Estimate follow-up for contractors: a 30-day cadence with templates

Follow up on every estimate on days 1, 3, 7, 14 and 30, switching between text, a phone call and email, and stop when the customer says no or asks you to. Most estimates aren’t signed on the first visit, so the follow-up is where many jobs are actually won. Below are the schedule, word-for-word templates, and what to send when a customer goes quiet.

By Eric Smith, founder of Outfitter AI and a former general contractor · Prices checked October 4, 2026

Outfitter AI wrote this and sells an AI receptionist; none of the follow-up steps below need it.

Why most estimates are won after you leave

ServiceTitan, which sells field-service software, reported in an April 2026 webinar recap that only 37% of estimates close on the first visit [1]. That’s vendor research from its own customers, not a neutral study, but it matches what most owners see: the bigger the ticket, the more often the answer is “let me think about it.”

The same recap advises at least four touchpoints before you give up on an open estimate [1]. ServiceTitan’s contractor playbook says follow-up should start within two days of delivering the estimate and keep going until you get a clear yes or no [2]. One Oklahoma home-service company in a ServiceTitan case study put one person on nothing but unsold estimates and reported recovering about $1 million of them in 2024 and $1.2 million in the first half of 2025 [3]. Your numbers will be smaller. The lesson is the same: open estimates are money sitting in a drawer. Follow-up is stage four of the five in the contractor sales guide.

The software companies don’t agree on exact timing, which tells you there’s no magic day. What they share is a plan written down in advance:

SourceFirst touchLater touchesWhen it ends
Jobber Academy [4]Two days after sendingOne week after sendingShortly before the quote expires
Housecall Pro guide [5]A day or two after sending4–5 days later, then a week after thatAfter the third try, move to a cold list
ServiceTitan playbook [2]Same-day check-in call, follow-up within two daysMixed text, email and videoWhen you get a yes or a no; long-term drip after
This guideDay 1Days 3, 7 and 14Day 30, then a seasonal check-in

We stretch the window to 30 days because home-service decisions wait on paydays, spouses, insurance adjusters and the weather. A roof replacement or a remodel can easily take a month to decide. A drain cleaning can’t, so shrink the schedule for small jobs.

The cadence: day 1, 3, 7, 14 and 30

Count from the day the customer received the estimate. Each touch has one job, and each uses a different channel so you aren’t repeating yourself.

  1. Day 1: text. Confirm they got it and invite questions. No pressure, no “just checking in.” You’re making it easy to reply.
  2. Day 3: phone call. This is the real sales touch. Ask what questions came up and whether the scope still matches what they want. Leave a short voicemail if they don’t pick up.
  3. Day 7: email with something useful. A photo of a similar finished job, a short video walking through the options, or an answer to the question most customers ask. Give them a reason to open it.
  4. Day 14: text that asks for a decision. Offer a simple way to say no. People who can say “not now” easily are more likely to answer at all.
  5. Day 30: the last-call message. Tell them you’re closing the file, mention when the price expires, and leave the door open. Then move them to a seasonal list.

Two rules make this work. First, every touch goes on a calendar the day you send the estimate, not when you remember. Second, if the customer gives you a date (“call me after the 15th”), that date replaces the schedule. ServiceTitan’s trainers make the same point: when a customer asks to be called after a vacation, change the follow-up date so it comes back at the right time [1].

Timing within the day matters a little. Jobber suggests sending email in the weekday morning window, roughly 6 to 10 a.m., based on outside research it links [4]. For calls, try early evening when homeowners are off work, and avoid dinner. If speed on the first contact is your weak spot, read how fast to call back leads; the same logic applies to the estimate itself.

Copy-and-paste follow-up templates

Swap in your names and details. Keep the texts short enough to read on a lock screen. Each one ends with an easy question.

Day 1 text: Hi Maria, it’s Dan from Ridgeline Heating. Just making sure the estimate for your furnace and AC came through okay. Any questions so far? Happy to explain anything on it.

Day 3 call opener: Hi Maria, Dan from Ridgeline. I’m calling about the estimate I sent Tuesday. Did you get a chance to look it over? … What questions came up when you talked it through at home?

Day 3 voicemail: Hi Maria, Dan from Ridgeline Heating about your system estimate. No rush on a decision. I wanted to answer any questions before you compare. I’m at 555-0142, or just reply to my text. Thanks.

Day 7 email subject: Photos of a roof like yours, finished

Day 7 email body: Hi Tom, I put together a few photos from a re-roof we did last month on a house a lot like yours, same pitch and the same architectural shingle in your estimate. A couple of customers asked what the ridge vent looks like when it’s done, so I included a close-up. If anything in the estimate is unclear, reply here and I’ll walk you through it. — Angela, Summit Roofing

Day 14 text: Hi Priya, it’s Luis from Clearwater Plumbing. Are you still thinking about the water heater, or should I close out the estimate for now? Either answer is fine, I just don’t want to keep bugging you.

Day 30 text: Hi Ken, Rosa from Greenline Lawn. I’m closing out open estimates this week. Your price for the season plan is good through the end of the month. If the timing’s wrong this year, no problem. I’ll check in before spring.

Short video text (any day): Hi Beth, I recorded a two-minute video walking through the three bathroom options so you don’t have to decode my line items. Here’s the link. Questions welcome.

ServiceTitan’s playbook recommends short videos in texts or emails because they help customers understand the work [2]. A phone video in the driveway is enough. Nobody expects a production.

What to say when they go quiet

Silence usually means one of five things. Each needs a different message, so guess the likely one from your visit and pick the matching line.

The price surprised them

Offer a smaller first step instead of a discount. “If the full project is more than you planned, I can split it: the panel upgrade now and the lighting next spring. Want me to price it that way?” See good-better-best pricing for building options before you send.

They’re getting other bids

Help them compare, don’t knock the competition. “When the other quotes come in, check that they include haul-away and the permit. Happy to go line by line with you.” More in when customers are getting other bids.

Someone else has to agree

Offer to talk to both decision makers. “Would it help if I hopped on a quick call with you and your husband some evening this week?”

Money or timing

Ask the timing question plainly. “Is this a now project or a later one?” If later, set the date they give you. If money, mention payment options once, honestly. See offering financing.

They just forgot

This is the most common one. A friendly, specific text fixes it: name the job and the date of the visit so they place you instantly.

Don’t send a “last chance, price goes up Friday” text unless the price really changes Friday. Fake deadlines get you found out, and homeowners talk to neighbors. If your estimate has a real expiration date, say so once, near the end.

Reopening line after a long silence: Hi Dave, it’s Carla from Brightside Electric. We spoke in March about the EV charger. Did that project ever happen? If you still need it, I can refresh the estimate with current material prices.

When to stop following up

Stop active follow-up when any of these happen:

Opt-out words are a legal issue, not just manners. If you send texts through an automated system, FCC rules that took effect April 11, 2025 require honoring opt-out requests made by any reasonable means, including words like stop, quit, cancel, unsubscribe and end, within no more than 10 business days [6]. You may send one confirmation text with no promotion in it within five minutes [6]. A broader rule that would make one opt-out cover every type of message has been pushed back to January 31, 2027 [7]. This isn’t legal advice; the simple habit is to treat “stop” or “please don’t text me” as final across everything.

Closing-the-file reply after a no: Thanks for letting me know, Sam. I appreciate the straight answer. If you don’t mind me asking, was it price, timing or something else? Either way, keep my number for anything down the road.

How to run it in a small shop

The best cadence fails if it lives in your head. Set it up once and spend 15 minutes a day on it.

  1. Pick one owner. In a two-truck shop that’s probably you or the person who answers the phone. In the Oklahoma case above, the job was one coordinator’s whole day [3]. Someone has to own the list, or nobody does.
  2. Keep one list. Your job software’s quote list, or a spreadsheet with these columns: customer, job, amount, date sent, next touch date, last response, status.
  3. Block the time. Same slot every day, before the first job or right after the last one. Sort by “next touch” and work down.
  4. Load the templates. Save the texts above as canned replies on your phone or in your software so each touch takes seconds.
  5. Track two numbers monthly. Estimates sent and estimates won. Track them separately for jobs your techs found on service calls and jobs that came from ads; ServiceTitan notes that marketed leads are much harder to close [2].

Adjust by trade. A cleaning company quoting a weekly plan can compress the whole cadence into ten days. A remodeler quoting a basement might stretch the gap between touches but add a second in-person visit. A pest control company quoting a quarterly plan should follow up fast, because the bugs aren’t waiting. Plumbing and HVAC replacement quotes sit in the middle: the old unit is limping along, and the decision often lands on the next cold snap or heat wave.

When customers call back, make sure someone answers. A follow-up that triggers a return call to a full voicemail box undoes the work. Our missed-call text back guide covers the fix.

Common questions

How many times should a contractor follow up on an estimate?
Plan on four or five touches over about 30 days, using text, a phone call and email. ServiceTitan's training recommends at least four. Stop sooner if the customer says no or asks you to stop.
How soon after sending an estimate should I follow up?
The next day is a good default for a short text confirming they received it. Jobber suggests two days and ServiceTitan's playbook says within two days. For urgent repairs, follow up the same day.
Is it pushy to follow up on a quote?
Not if each message is short, useful and gives an easy way to say no. Pushy is fake deadlines, daily calls, or ignoring a request to stop. Many homeowners read steady follow-up as a sign that you'll show up for the job too.
What do I say when a customer ghosts me after an estimate?
Send a text that makes no an acceptable answer, such as asking whether to keep the estimate open or close it out for now. That usually gets a reply. If it doesn't, send one final message around day 30 and move them to a seasonal list.
Should I follow up by text or by phone?
Use both. Texts get read and are easy to answer, so use them for quick check-ins. Use one real phone call, around day three, for questions and objections that are hard to handle in writing.
Do I need permission to text customers about their estimate?
A customer who gave you their number for the estimate expects to hear about it, but rules differ for automated or marketing texts. If you use an automated texting system, honor any opt-out request such as stop or unsubscribe promptly; FCC rules require it within 10 business days. Check with a lawyer for your situation.
When should I give up on an estimate?
After a clear no, a request to stop, or about 30 days of silence after four or five touches. Then move the customer to a list you contact once before their next busy season.

Sources and how we compared

Figures and timing advice come from ServiceTitan, Jobber and Housecall Pro’s own published guidance and case studies (vendor research, not independent studies) and from law firm summaries of FCC consent rules, all opened October 4, 2026.

  1. ServiceTitan: Webinar recap, Follow-Ups 101: Back 2 Basics — April 2026; vendor research and training
  2. ServiceTitan Contractor Playbook: Follow-up coordinator — Vendor guidance
  3. ServiceTitan: Above + Beyond saves $1.2 million in unsold estimates — September 2025; vendor case study
  4. Jobber Academy: Quote follow-up email templates — May 2026; vendor guidance
  5. Housecall Pro: How to follow up on a quote — Updated October 2025; vendor guidance
  6. Nixon Peabody: FCC partially delays new TCPA consent revocation rules — April 11, 2025; law firm alert
  7. Burr & Forman: FCC delays TCPA revoke-all rule until January 31, 2027 — January 7, 2026; law firm blog

Last updated October 4, 2026. Prices change; if something here is out of date, call or text (507) 628-0400 and we’ll fix it.